Send a location pin. We'll come and measure.

A free visit anywhere in the five emirates. We measure the roof or the yard, read your pump plate, and leave you an itemised fixed-price quote — with an honest answer if solar is the wrong fit.

Al Noor Solar site visit at a property outside the city
Before you call

What helps us give you a straight answer

For a villa

  • A recent electricity bill, or your typical summer amount
  • Roughly what runs the load — AC units, water heater, pool pump
  • A photo of the roof if you have one

For a farm or azba

  • The plate on your water pump — rating and voltage
  • How many hours a day the pump actually runs
  • What else needs power: fans, pen lights, worker room, fridge
  • Whether you need anything running after dark

None of it is essential. If you have nothing but a location pin, send that — the rest is what the site visit is for.

Free site visit

Send a location pin. We'll come and measure.

Anywhere in the five emirates, at no cost and with no obligation. You get an itemised fixed-price quote — and an honest answer if solar is the wrong fit.

This opens WhatsApp with your details filled in — nothing is sent until you press send there.

Before we come out

How much solar does a camel farm need?
Most azba loads are a water pump, shed fans, lighting and a worker room with a fridge. That usually lands between 3 and 8 kWp with a battery sized for night running. We size it from your actual pump rating and daily running hours during the free site visit.
Why do you only install up to 10 kWp?
Because small systems are a different craft from megawatt rooftops, and they are the ones large contractors rush. Keeping our range at 1 to 10 kWp means every job gets a proper site visit, an owner-supervised installation and a same-week service response.
Can solar replace my diesel generator?
For most farm loads, yes. Solar with battery storage runs the pump and lights through the day and evening, and the generator stays only as a rare backup. Owners typically stop the daily fuel trips altogether.
How long does installation take?
An off-grid farm system is normally installed in one to two days, and a villa rooftop system is also two days on site. We confirm the exact schedule with you at the free site visit.
WhatsApp